I have a set of enablers, and they need to be rated in terms of ability to impact project and second: frequency of competent execution. So I am using a side by side question type with the enablers as answer choices and two columns (one for ability to impact project (1-5 scale) and second for frequency of competent execution (1-6 scale). I want an additional column to the left of the enablers so that I can input the project phase (as the header) and assign design, procurement, construction etc as the phases for the enablers
Already have an account? Login
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.