Hi Qualtrics Team,
I’ve created a Workflow to connect Qualtrics with a G-sheet so each interview is loaded into this:
I have a question regarding the progress of the interviews as for this project we load those which have been fully completed or considered incomplete:
For instance, for previous waves this is an example of the progression of the interviews loaded into the ‘Data & Analysis’ tab:
My question is how to setup de ‘workflow’ so both complete and incomplete interviews are considered to be loaded into the Google sheet.
Thanks!