Asign metric into multiple touchpoint for Journey chart in 1 survey | XM Community
Skip to main content
Question

Asign metric into multiple touchpoint for Journey chart in 1 survey

  • September 18, 2023
  • 0 replies
  • 39 views

Nam Nguyen
QPN Level 8 ●●●●●●●●
Forum|alt.badge.img+29

Hi guys, I’m having a 7 step Journey but in 4 surveys in the following structure:

Survey1: Step 1,2,3 - Survey2: Step 4 - Survey3: Step 5,6 - Survey4: Step 7.

Each step has its own CSAT, each survey has its own tNPS. So we have 7 CSAT and 4 NPS

My guys already collecting data with touchpoint Embedded Data tag for each survey and it’s fine when draw a 4 touchpoint journey widget with 4 NPS.
But now they want a breakdown 7 step CSAT with the journey widget.

How can I do it with the already collected data and set up so the CSAT got assigned into multiple touchpoints in 1 survey. I already check this Configuring Dashboard Data for Journeys (qualtrics.com) but the survey have to collect all CSATs, can’t go for branch.


Thank you in advance!