Hi,
We are looking at a survey which will have a subset of questions at the end, determined by embedded data.
If there were two or three subsets, I'd use branch logic without hesitation. However this could be pushing 100 different blocks. This will be cumbersome in the survey flow GUI, but other than that is there a reason not to do it?
Thanks!
Page 1 / 1
Hello,
According to me, branch logic is the only option to have subsets of questions. Though your concern about the flow being cumbersome but that's the only option I see.
Leave a Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.