Hi, I am running my first life cycle project. It is an onboarding survey, that will be sent after 2 weeks being in the company. I would like to make sure that participants only take the survey during their third or fourth week tops. I don't want them to take the survey after that, because then it would not be a survey on their second week. Is it possible to define that for the project? I only found the nomral expiration dates, but it does not solve my problem, because I would need a different expiration date for each participant, based on their entry date.
Apparently, I can't do that, but I prefer to check with you. I need to combine a set of 4 answers (they are 4 values in a matrix question) and compute a result based on that combination, for each of the rows in the matrix. I would like to show the result in the dashboard. Another option is doing it in the reports section of the Research Core module, but I have not found the option to do that there either.Thanks!
Hi, I am experiencing some issues with the comparison to previous projects. In the past, the dashboard used to compare each unit with the result of that unit in a previous project, regardless of which participants belonged to that unit. It would just match the current unit with the appropriate one and show the difference with it. The newest project that I have, which is a dashboard built in September- October, is not comparing correctly with previous projects. If I see that a unit has a difference of 5 points with the previous survey, then I check the old dashboard and if I see the result, the difference is 10 (just to give an example). Qualtrics Support replied that the way in which the dashboard is supposed to compare units is considering only the people that exist both in the current project and in the historical one. I am sure that it did not work this way in previous dashboards. Actually, my previous projects are not showing this problem. It happens only with the newest one. Has
Hi, I would like to know if its possible to report results from a non-EX project in the same dashboard. When I create a new project I can see 4 optiones: Employee Engagement, Employee LifeCycle, Blank Project, and other. If I use the Blank Project of the EX module, instead of a blank project from the Research Core Module... Am I able to pull those results into an EX dashboard? I think it is not possible, right? So in case I want to do that, I should use one of the "blue options", right? Thanks! !
Hi! I want to build a dashboard and report data from different surveys. Is it possible to import data from the Research Core Module? Or does it only work within the projects that belong to the EE Module? Thank you!
Already have an account? Login
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.
Sorry, we're still checking this file's contents to make sure it's safe to download. Please try again in a few minutes.
Sorry, our virus scanner detected that this file isn't safe to download.