I am looking to use dates in basic calculaitons for display logic and validation. I have entered a static date (e.g., "Date" = 12/10/2018) into embedded data and attempted the code below, but the piped text shows up blank. I was told by qualtrics support to try the community to see if there is a way to modify a static date (not a moveable date like ${date://OtherDate/SL/-2%20day}) so that I can set a single date and then use code/syntax to update a series of other entries such as those below.
Response options:
Journal Entry 1 for ${e://Field/Date}
Journal Entry 2 for ${e://Field/Date+1}
Journal Entry 3 for ${e://Field/Date+2}
Journal Entry 4 for ${e://Field/Date+3}
etc.
I know that we can simply enter manually in every date, but with multiple data collections having a single or set of dates that I can enter where all other entries will be updated around them would be very helpful.
Thanks for any help you can provide!
Best answer by fleb
View original