Can anyone help me out with the piped in value for End date, recorded date and start date. I need these values to be piped into the end of the survey
Page 1 / 1
Instead of using those you could create your own embedded data elements at the beginning and end of the survey that are date variable types. Then set the value for those elements to be current date / time. You will be able to pipe those fields in.
Leave a Reply
Enter your E-mail address. We'll send you an e-mail with instructions to reset your password.